Project description
Preinvestment Technical Design Study for the Construction of an Irrigation System in the Municipality of Tupiza (Ajnapa). In the Department of Potosí, Municipality of Tupiza.
Contractor | MINISTERIO DE MEDIO AMBIENTE Y AGUA UNIDAD COORDINADORA DE PROGRAMAS |
---|---|
Start date | 04-07-2017 |
End Date | 20-03/2019 |
Duration | 7 months |
Location | Dpto. Potosí, Municipio Tupiza |
Sector | Producción Agrícola |



A study and design of alternatives was carried out, trying to provide a parallel choice to the construction of a dam on the San Juan del Oro river. Due to the topographic and geological arguments presented in the project area.
In the process of carrying out the study, we worked together with all the beneficiaries of the municipality, continuously holding informative meetings and presentations of the different design alternatives for the irrigation system.